Lumela schrieb:nein, nein, da steht eindeutig . . .on the 01st April 2021 😐
Published On April 1, 2021
Vielleicht alles nur ein Aprilscherz... 🤪
GinaChrisThemenstarter4’984 Beiträge · seit 201601. Mai 2021 ·
Ministry of Transport and Communications-Botswana 11 Std. ·
PRESS RELEASE OFFICIAL OPENING OF KAZUNGULA BRIDGE PROJECT AND ONE STOP BORDER POST FACILITIES The Ministry of Transport and Communications is pleased to announce that the official opening of the Kazungula Bridge and one stop border post facilities is scheduled for the 10th May 2021. The construction of the bridge over the mighty Zambezi River, commenced in December 2014 and the final inspection was undertaken by the Minister of Transport and Communications, Honourable Thulagano Merafe Segokgo and his counterpart in Zambia, Minister for Infrastructure, Honourable Vincent Mwale in October 2020. The Ministry of Transport and Communications applauds its strategic partner in this development, the Republic of Zambia for the successful completion of this magnificent project. The project is an indication of the flourishing bilateral relations, which the two countries have enjoyed over time. The Ministry further extends its gratitude to the Co-funders, Japan International Cooperation Agency (JICA), African Development Bank (AfDB), and other major stakeholders for contributing enormously to ensure the project is realized. The Bridge and its associated works, is expected to ease access to international markets through connectivity with major seaports as well as contribute to maximizing the operational efficiency of the SADC north-south corridor and enhance regional economic integration. Freight and passengers transit time is projected to be significantly reduced due to improved border management operations arising from the One Stop Border facilities. Following the devastating impacts of COVID-19, the Kazungula Bridge is anticipated to enhance the prospects of attracting more private sector investment, boost the tourism sector and contribute to advancement of the quality of life of the communities in the region. PROFILE OF THE BRIDGE The project has three (3) components being Package 1, 2 and 3 respectively consisting of the following: 1. Package 1 is the bridge, which is designed as an extra-dosed road-rail bridge to accommodate a future railway line which will link Mosetse-Kazungula in Botswana to Kazungula-Livingstone in Zambia. (Single carriageway for motor vehicles, single railway track and pedestrian walkways on both sides) .The Bridge has specifications of length 18.5m width and span arrangement of 923m. This package also includes an approach road on the Botswana side of 302m and 416m on the Zambia side. 2. Packages 2 and 3 are the One-Stop-Border Post (OSBP) facilities on the Botswana and Zambia side respectively. Each package consists of among others, a passenger terminal, vehicle inspection building, freight inspection building, truck transit offices (entry and exit), health inspection building and veterinary offices. The packages also caters for internal circulation roads and car parking facilities for buses, trucks and light motor vehicles as well as access roads to the new border posts. Funding • The construction supervision was awarded to the Kazungula Bridge Consultants-Joint Venture comprising of Nippon Koei Co. Ltd., Chodai Co. Ltd., Gibb (Pty) Ltd, Bothakga Burrow Botswana (Pty) Ltd, CPP Botswana (Pty) Ltd and Zulu Burrow Development Consultants Ltd at a cost of USD 15, 726, 755.00 funded by JICA. • Package 1: funded by both Governments of Botswana and Zambia on 50% basis. The contract was awarded to Daewoo Engineering and Construction at an original sum of USD 161 961 304.84 which has been revised to USD 174 184 799.54 to incorporate 16% VAT component from the Government of the Republic of Zambia. • Package 2, One Stop Border Post Botswana was funded by JICA exclusive of VAT while the Botswana Government funded the VAT component. The contract was awarded to Zhong Gan Engineering & Construction at a cost of BWP 440, 116, 275.30. • Package 3, One Stop Border Post Zambia is funded by AfDB. The Contract was awarded to Anhui Foreign Economic Construction Group Co. Ltd at a cost of ZMW 263, 670, 419.98. For more information please contact: Ministry of Transport and Communications Public Relations Office Email: mtcpro@gov.bw website: www.gov.bw Phone: + 267 361 2000/2013/5553 -Ends-
Gruß Gina
GinaChrisThemenstarter4’984 Beiträge · seit 201606. Mai 2021 ·
aus fb DriveBots
Gruß Gina
travelNAMIBIA33,5k Beiträge · seit 200609. Mai 2021 ·
Davon mal abgesehen, dass mit der Fähre auch ein hübsches Erlebnis verbunden war, hab ich mal ne Frage zur Abwicklung an der Grenze.
Kommt man nun flott rüber nach Sambia, weil es ne Brücke gibt, und muss dann auf der anderen Seite weiterhin die umständlichen Formalitäten, verbunden mit Schwärmen freundlicher Helfer, auf sich nehmen? Oder hat sich dazu auch mal jemand Gedanken gemacht und das etwas verbessert? Zum Beispiel eine Zahlstelle, und die Kohle wird dann intern verteilt?
Mit der neuen Kazungula Straßen- und Eisenbahn-Brücke zwischen Botswana und Sambia wird in Zukunft nicht nur das Reisen zwischen den beiden Ländern vereinfacht, sondern wird der Güterhandel im südlichen Afrika zügiger vonstatten gehen...
Davon mal abgesehen, dass mit der Fähre auch ein hübsches Erlebnis verbunden war, hab ich mal ne Frage zur Abwicklung an der Grenze.
Kommt man nun flott rüber nach Sambia, weil es ne Brücke gibt, und muss dann auf der anderen Seite weiterhin die umständlichen Formalitäten, verbunden mit Schwärmen freundlicher Helfer, auf sich nehmen? Oder hat sich dazu auch mal jemand Gedanken gemacht und das etwas verbessert? Zum Beispiel eine Zahlstelle, und die Kohle wird dann intern verteilt?
Grüße Ebi
Na, ob das Prozedere, besonders bei der Einreise nach Sambia, durch die Brücke einfacher wird, da habe ich so meine Zweifel. Sofern man jetzt keine sambischen Kwacha mehr braucht, um irgendetwas im Zusammenhang mit dem Grenzübertritt zahlen zu müssen, wäre dies nur ein Vorteil, wenn direkt an den Gebäuden des border control auch ein 24/7 funktionstüchtiger, immer gut gefüllter ATM stehen würde, der Kwacha ausgibt. Sollte man bei der Planung des Ganzen solche, für Grenzübergänger komfortable Vorrichtung, schlicht vergessen haben und dennoch Kwacha benötigen, hat man wieder Dreck im Schachterl. Denn dann muß man die sambische Valuta eben schon im Geldbeutel haben oder sich -wie bisher- in Sambisch-Kazungula bei den fliegenden "Helfern" beschaffen.
Freue mich schon heute auf die ersten Brücken-Grenzübertritt-Erfahrungsberichte hier im Form.
LG vom Alm
GinaChrisThemenstarter4’984 Beiträge · seit 201619. Mai 2021 ·
Hi,
nachdem es ja nun auf beiden Seiten einen one-stop-border-post gibt, man also zur Aus- und Einreise von einem ins andere Land nur mehr einmal die Formalitäten erledigen muss, denke ich schon dass das einiges erleichtert und beschleunigt. Die Auspreisung in 3 Währungen lässt vermuten, dass man damit auch bezahlen kann. Gruß Gina
Wenn alles planmässig verläuft, wollen wir #safaribrothers ab ca. Mitte Januar mal über die Brücke zuckeln. Ich setze mir mal einen Termin im Kalender für nach der Rückkehr und werde dann hier Bericht erstatten. 😁
GinaChris schrieb:Infos aus dem Netz: lt. div. Berichten soll die Bezahlung der Gebühren ausschließlich in bar möglich sein; auch ATM würde es keinen geben. Gruß Gina
Moin Gina,
gibt es denn auch schon Infos darüber, ob in tatsächlich den drei genannten Währungen (BWP, ZMW und USD) gezahlt werden kann?
LG vom Alm
GinaChrisThemenstarter4’984 Beiträge · seit 201615. Juni 2021 ·
Hi Alm,
sorry, vergessen... Ja, man soll in diesen 3 Währungen bezahlen können. Gruß Gina